Installation steps of electric hoist track

18m Under Bridge Inspection Unit (4)
The installation of an electric hoist track is a crucial process that demands precision and attention to detail to ensure the safe and efficient operation of the electric hoist. Understanding and following the correct installation steps are essential for a successful installation.

SHACMAN M3000 15 Ton Knuckle Boom Garabia (3)

Track installation is indeed an essential step in the overall installation of electric hoists. Electric hoists are commonly installed and used on U-shaped tracks due to their stability and suitability for various applications. This characteristic of U-shaped tracks provides a reliable and secure platform for the electric hoist to operate.

SHACMAN 16 Ton Knuckle Boom Garabia (8)

The first step in the installation process is to arrange the steel cable in the middle of the track. Specifically, the steel cable is placed on the upper part of the I-beam. This positioning is crucial as it provides the necessary support and guidance for the movement of the electric hoist. The choice of steel cable is important, and in this case, a 10mm tapered wire rope or round steel bar is typically used. The 10mm diameter provides sufficient strength to handle the weight and forces exerted by the electric hoist and the loads it will be lifting.
The top of the steel cable is fastened with a turnbuckle. The turnbuckle serves several purposes. Firstly, it allows for tension adjustment of the steel cable. This is important as it ensures that the steel cable is taut and provides a stable path for the electric hoist to move along. By adjusting the turnbuckle, the tension can be optimized to prevent sagging or excessive stretching of the cable. Secondly, the turnbuckle provides a secure connection point, reducing the risk of the cable coming loose or detaching during operation.

HINO 20 Ton Knuckle Boom Garabia (3)

The sliding ring is a critical component in the installation. It is designed to allow smooth movement of the electric hoist along the steel cable. The sliding ring is made up of two rings buckled together with a certain margin. This margin is essential to avoid scraping and jamming of the steel cable. When the electric hoist moves along the cable, the sliding ring glides smoothly, reducing friction and ensuring efficient operation. The two rings are designed to fit snugly around the steel cable while still allowing for easy movement.
The steering ring is another important element. It is composed of two rings connected by bolts and is designed to rotate freely. One end of a steering ring is sleeved on the steel cable. The steering ring serves as a pivot point for the movement of the electric hoist. As the electric hoist moves, the steering ring allows for smooth changes in direction, enabling the hoist to move in a straight line or in a circular motion as required. The ability to rotate freely is crucial as it reduces stress on the steel cable and the hoist components, ensuring long-term durability and reliability.

SHACMAN X3000 21 Ton Knuckle Boom Garabia (6)

After leaving the motor lead wire, the rubber-sheathed wire is fixed at the lower end of the steering ring. The rubber-sheathed wire provides the electrical connection between the electric hoist motor and the power source. Fixing it at the lower end of the steering ring ensures that it is in a secure position and does not interfere with the movement of the hoist. The rubber sheath provides insulation and protection against electrical hazards, ensuring the safety of the installation.
Then, one end of multiple sliding rings is threaded onto the steel cable. These sliding rings play a crucial role in supporting the weight of the electric hoist and facilitating its movement along the cable. By threading multiple sliding rings onto the cable, the load is distributed evenly, reducing stress on individual components and ensuring smooth operation. After threading the sliding rings onto the cable, the rubber-sheathed wire is fixed at the lower end of the sliding ring in sections. This step ensures that the electrical connection is maintained throughout the length of the track and that the wire does not become tangled or damaged during operation.

SHACMAN 23 Ton Knuckle Boom Garabia (2)

The front end of the electric hoist is connected to the motor and can rotate freely. This connection allows the motor to drive the hoist and control its movement. The ability to rotate freely is important as it allows for smooth operation and reduces stress on the motor and hoist components. The rear end of the electric hoist is connected to the power supply. This connection provides the electrical energy needed to operate the motor and perform the lifting and lowering functions of the hoist.
Under the traction of the motor and with the steering ring as the center, the traction steel cable moves in a straight line or in a circular motion. The motor provides the power to move the hoist along the steel cable. The steering ring acts as a guide, ensuring that the hoist follows the desired path. Whether moving in a straight line or in a circular motion, the combination of the motor, steel cable, sliding rings, and steering ring work together to provide a reliable and efficient lifting solution.

SHACMAN 23 Ton Knuckle Boom Garabia (5)

For example, in an industrial warehouse setting, the installation of an electric hoist track follows these steps. The steel cable is carefully positioned on the I-beam, and the turnbuckle is adjusted to ensure proper tension. The sliding rings and steering rings are installed to allow for smooth movement of the hoist. The motor lead wire and rubber-sheathed wire are connected and secured, ensuring a reliable electrical connection. Once installed, the electric hoist can be used to lift and move heavy loads throughout the warehouse, improving efficiency and productivity.
Bukatzeko, the installation steps of an electric hoist track are complex but essential for ensuring the safe and efficient operation of the electric hoist. By carefully following these steps and using high-quality components, the installation can be completed successfully, providing a reliable lifting solution for various applications.